It would be easy on us if we can do this before the end of march, The service end of our business gets busy after that.
I spoke with the fire dept and they will run a line for us if we feel the need. I do need a head count for engines so we can work on the details. Bring you eng with a crash box mounted on your bell housing we can hook to any flange size. Also bring your fuel pumps. I need to know what kind of headers you have so we can have the right size tail pipes.
I spoke with the fire dept and they will run a line for us if we feel the need. I do need a head count for engines so we can work on the details. Bring you eng with a crash box mounted on your bell housing we can hook to any flange size. Also bring your fuel pumps. I need to know what kind of headers you have so we can have the right size tail pipes.
#277
Banned
Join Date: Dec 2009
Posts: 14
Likes: 0
Received 0 Likes
on
0 Posts
I'm game but I think the criteria should be as follows;
-Motor must be taken out of the boat at Mark's
-NO TURBO'S only supercharged
-Fully dressed
-Wet exhaust
-No alky
-After the dyno runs drain all fuel out of the boats and fill them up with 93.
-Install motors back in boat
-Then all participants shall do a 200 mile run together to prove these are real poker run motors
-Motor must be taken out of the boat at Mark's
-NO TURBO'S only supercharged
-Fully dressed
-Wet exhaust
-No alky
-After the dyno runs drain all fuel out of the boats and fill them up with 93.
-Install motors back in boat
-Then all participants shall do a 200 mile run together to prove these are real poker run motors
#280
Registered
Join Date: Jul 2005
Posts: 40
Likes: 0
Received 0 Likes
on
0 Posts
when bill at ateco built two motors for me last winter he quoted me a price before he started,job finished same price as original quote.motors run great and boat is faster than i originally expected.all parts where new.i think when your building an engine with some used parts there can some issues. until they tear down ,clean up and inspect all parts.