The project begins
#1
Registered
Thread Starter
The project begins
What I did tonight will take many hours to put back together
[ATTACH=CONFIG]540152[/ATTACH][ATTACH=CONFIG]540153[/ATTACH][ATTACH=CONFIG]540154[/ATTACH].
[ATTACH=CONFIG]540152[/ATTACH][ATTACH=CONFIG]540153[/ATTACH][ATTACH=CONFIG]540154[/ATTACH].
#2
Registered
Thread Starter
The boat goes to have the gel coat on the bottom and other places fixed. And while it is there the dash gauge holes are going to get filled. and the exhaust holes and others on the transom also. After it comes back from there then the new gauges go in and the boat will get rewired. ( the wiring was a mess ) Then the extension box goes on and the new motor goes in. A lot of work to do in the next 5 weeks.
#7
Registered
Thread Starter
Made a few changes.
Now the real work begins - putting it all back together
[ATTACH=CONFIG]542090[/ATTACH].
[ATTACH=CONFIG]542091[/ATTACH]
[ATTACH=CONFIG]542092[/ATTACH]
Now the real work begins - putting it all back together
[ATTACH=CONFIG]542090[/ATTACH].
[ATTACH=CONFIG]542091[/ATTACH]
[ATTACH=CONFIG]542092[/ATTACH]
#8
Registered
Thread Starter
Next step is installing the extension box. going up a little more. Was at 1 inch above - thinking on going up another 1 1/2 inches. At least going up 1 inch.
I had the bottom of the outdrive cut out filled 1 1/2 inches. and all of the bolt holes filled. Had ALL of the screw and bolt holes in the engine compartment filled and the entire engine compartment painted with awlgrip.
I had the bottom of the outdrive cut out filled 1 1/2 inches. and all of the bolt holes filled. Had ALL of the screw and bolt holes in the engine compartment filled and the entire engine compartment painted with awlgrip.
Last edited by Tinkerer; 06-13-2015 at 09:48 PM.