Offshoreonly.com

Offshoreonly.com (https://www.offshoreonly.com/forums/)
-   General Boating Discussion (https://www.offshoreonly.com/forums/general-boating-discussion-51/)
-   -   Apache New Project. (https://www.offshoreonly.com/forums/general-boating-discussion/64088-apache-new-project.html)

Steve 1 12-03-2003 07:13 AM

Top spin this is a running boat. We have the new 41 all CNC'ed dead true ..Beautifully finished and done..

BUT we are TRUE Custom Boat-builders this is showing the depth of the company and that side as well.


The fastening to the jig (was CNC cut also) is done very sporadically to allow some movement The system is self fairing for the most part.



The Glass/Building system in the One Off is the same to be used in the molded Apaches based on the World standard SP systems.
In this case the Ampreg 22 Epoxy/Proprietary Apache Lamanite and A LOT of Bagging.

Thanks for your interest and Best Regards

Nykamp 12-03-2003 08:18 AM

APACHE
 
Steve is this the 47 or is it bigger? When I was there last you and about 10 other guys were working on this project so I didn't ask to many questions. Looking good, Steve.

BLee 12-03-2003 08:28 AM


Originally posted by Steve 1
Oop's wrong photo
Are those the steps or step (post #25), or does it have any?

Nice of you to post your progress. I like the custom touch.

vtec 12-04-2003 11:17 AM

I would like to see the keel area. How do you fill the gap between the foam panels?

Post as much as you can Steve 1, these photos of construction are my favorite stuff on OSO.

Regards,

vtec

SS930 12-04-2003 11:31 AM

Steve,
how is the planking attached to the end-grain of the plywood?

TopSpin80 12-04-2003 01:12 PM

we need some more pics of the progress!

Ernie

sgrady 12-04-2003 01:47 PM

Keep the pics coming !!! How many steps ?

Steve 1 12-04-2003 09:03 PM

I just got in from the Shop. Will have more pictures tomorrow.

vtec there is a epoxy product from SP systems we have in stock to bond the foam.it is the finest I have ever used BTW ..It has the consistency of mayonnaise and a 80 minute working time..

sgrady that is the One Plus bottom.

Thanks and Best Regards

sgrady 12-04-2003 10:43 PM

One Plus, sorry but I cannot remember nor see it on the site. Was this the 3 Step bottom then ? I vaguely remember the drawing.

Lastly was the drawing correct on the step placement ?

Thanks

Steve 1 12-04-2003 11:53 PM

sgrady:
The drawing is close but the exact vent/strake/shape/placement is not shown on any public picture yet.

I will post more as the bottom gets finished this weekend.


All times are GMT -5. The time now is 01:07 PM.


Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.