Top spin this is a running boat. We have the new 41 all CNC'ed dead true ..Beautifully finished and done..
BUT we are TRUE Custom Boat-builders this is showing the depth of the company and that side as well.
The fastening to the jig (was CNC cut also) is done very sporadically to allow some movement The system is self fairing for the most part.
The Glass/Building system in the One Off is the same to be used in the molded Apaches based on the World standard SP systems.
In this case the Ampreg 22 Epoxy/Proprietary Apache Lamanite and A LOT of Bagging.
Thanks for your interest and Best Regards
BUT we are TRUE Custom Boat-builders this is showing the depth of the company and that side as well.
The fastening to the jig (was CNC cut also) is done very sporadically to allow some movement The system is self fairing for the most part.
The Glass/Building system in the One Off is the same to be used in the molded Apaches based on the World standard SP systems.
In this case the Ampreg 22 Epoxy/Proprietary Apache Lamanite and A LOT of Bagging.
Thanks for your interest and Best Regards
#32
Registered
APACHE
Steve is this the 47 or is it bigger? When I was there last you and about 10 other guys were working on this project so I didn't ask to many questions. Looking good, Steve.
#33
Charter Mod
Charter Member
Originally posted by Steve 1
Oop's wrong photo
Oop's wrong photo
Nice of you to post your progress. I like the custom touch.
#34
Registered
Join Date: Mar 2002
Location: Sterling Heights MI
Posts: 369
Likes: 0
Received 0 Likes
on
0 Posts
I would like to see the keel area. How do you fill the gap between the foam panels?
Post as much as you can Steve 1, these photos of construction are my favorite stuff on OSO.
Regards,
vtec
Post as much as you can Steve 1, these photos of construction are my favorite stuff on OSO.
Regards,
vtec
#38
Platinum Member
Platinum Member
Thread Starter
Join Date: Apr 2001
Location: Beautiful Fort Lauderdale www.cheetahcat.com
Posts: 10,833
Likes: 0
Received 6 Likes
on
6 Posts
I just got in from the Shop. Will have more pictures tomorrow.
vtec there is a epoxy product from SP systems we have in stock to bond the foam.it is the finest I have ever used BTW ..It has the consistency of mayonnaise and a 80 minute working time..
sgrady that is the One Plus bottom.
Thanks and Best Regards
vtec there is a epoxy product from SP systems we have in stock to bond the foam.it is the finest I have ever used BTW ..It has the consistency of mayonnaise and a 80 minute working time..
sgrady that is the One Plus bottom.
Thanks and Best Regards
#39
Registered
Join Date: Nov 2000
Location: NW , IN USA
Posts: 1,073
Likes: 0
Received 0 Likes
on
0 Posts
One Plus, sorry but I cannot remember nor see it on the site. Was this the 3 Step bottom then ? I vaguely remember the drawing.
Lastly was the drawing correct on the step placement ?
Thanks
Lastly was the drawing correct on the step placement ?
Thanks
#40
Platinum Member
Platinum Member
Thread Starter
Join Date: Apr 2001
Location: Beautiful Fort Lauderdale www.cheetahcat.com
Posts: 10,833
Likes: 0
Received 6 Likes
on
6 Posts
sgrady:
The drawing is close but the exact vent/strake/shape/placement is not shown on any public picture yet.
I will post more as the bottom gets finished this weekend.
The drawing is close but the exact vent/strake/shape/placement is not shown on any public picture yet.
I will post more as the bottom gets finished this weekend.