The new project boat.
#8
Registered
Thread Starter
Join Date: Jan 2009
Location: boston mass
Posts: 133
Likes: 0
Received 0 Likes
on
0 Posts
#10
Registered
Thread Starter
Join Date: Jan 2009
Location: boston mass
Posts: 133
Likes: 0
Received 0 Likes
on
0 Posts
34 scarab project
Today i cut all 5 knees out,and gut all of the wood out of the transom.
The wkole transom was soaked with water!
I will be posting more pics soon!
Here is a picture before i took everything out.
The wkole transom was soaked with water!
I will be posting more pics soon!
Here is a picture before i took everything out.