Go Back   Offshoreonly.com > Owner's Forum > Scarab


OSO Sponsor
NorTech
OSO Sponsor

Advertiser

Advertiser


Reply
 
 
 
 
Thread Tools
Old 08-03-2004, 06:12 PM   #21
Registered
Gold Member
 
syclone's Avatar
 
Join Date: Feb 2004
Location: Vienna/Austria
Posts: 70
Re: ´95 Scarab 22 Re-Rig

New antifouling is on.
Turnback time.
Attached Images
File Type: jpg bild32.jpg (17.6 KB, 5 views)
File Type: jpg bild33.jpg (24.4 KB, 4 views)
syclone is offline   Reply With Quote
Old 08-03-2004, 06:17 PM   #22
Registered
Gold Member
 
syclone's Avatar
 
Join Date: Feb 2004
Location: Vienna/Austria
Posts: 70
Re: ´95 Scarab 22 Re-Rig

The next shock was the floor. We already knew that the wood quality was really bad, also, I had noticed that the floor was so unstable that sitting was like in a rocking chair. So the old stuff had to come out, which was easy since the lamination where the floor met the sides of the boat was easily ripped off with a pair of pliers.
What came out was even more disgusting. the tank should be held in place by 2 wooden crossmembers which were stapled to the stringers. Yeah, but how...
Attached Images
File Type: jpg bild34.jpg (29.3 KB, 20 views)
File Type: jpg bild35.jpg (25.1 KB, 16 views)
syclone is offline   Reply With Quote
Sponsored Links
Old 08-03-2004, 06:27 PM   #23
Registered
Gold Member
 
syclone's Avatar
 
Join Date: Feb 2004
Location: Vienna/Austria
Posts: 70
Re: ´95 Scarab 22 Re-Rig

After we had the tank out, we reinforced all junctions of stringers, bottom, bulkhead, side walls with hevy weave glass.
the we dropped the tank back in and poured polyurethane foam around it. This stuff is amazing but, dont understimate the pressure it can generate! this tank wont move again. Ever. We also poured the foam in all major cavities underneath the floor in the forward section of the boat and under the (renewed) boards in the engine compartment (where the accessories are mounted), which should add more strength.
The new floor was made from 20mm plywood and got a sheet of 3mm aluminum in the area where the seats will be bolted down (so its not the wood alone holding them).
Unfortunately, I dont have any pics of that procedure.
All new wooden parts are coated with 2 coats of a polyurethane varnish to keep the moisture out. this is also some great stuff. You can thin it 1:200 with a special thinner, then it will soak itself to 25mm of plywood all the way.
I used this stuff to seal the gap between the transom and teh laminate (poured it in from the top, the area underneath the swim platform. Afer a few seconds, it came running out at the bottom of the transom through the drain plug! Now some of you may know why their transoms rot!)
Attached Images
File Type: jpg bild36.jpg (29.8 KB, 10 views)
syclone is offline   Reply With Quote
Old 08-03-2004, 06:31 PM   #24
Registered
Gold Member
 
syclone's Avatar
 
Join Date: Feb 2004
Location: Vienna/Austria
Posts: 70
Re: ´95 Scarab 22 Re-Rig

Deck was back on, sealed this time with polyurethane sealer (will last forever. You could glue the engine in with that stuff).
One of the new seats I got through ebay;
Second pic, floor is almost finished, top layer was 500gram chopped strand mat to cover the wood. A last layer of yellow gelcoat will come on later.
Attached Images
File Type: jpg bild36a.jpg (23.6 KB, 12 views)
File Type: jpg bild37.jpg (20.2 KB, 8 views)
syclone is offline   Reply With Quote
Old 08-03-2004, 06:33 PM   #25
Registered
Gold Member
 
syclone's Avatar
 
Join Date: Feb 2004
Location: Vienna/Austria
Posts: 70
Re: ´95 Scarab 22 Re-Rig

Fabricating new side panels for the cockpit and the repaired bulkhead
Attached Images
File Type: jpg bild38.jpg (24.7 KB, 6 views)
File Type: jpg bild39.jpg (24.2 KB, 7 views)
syclone is offline   Reply With Quote
Old 08-03-2004, 06:37 PM   #26
Registered
Gold Member
 
syclone's Avatar
 
Join Date: Feb 2004
Location: Vienna/Austria
Posts: 70
Re: ´95 Scarab 22 Re-Rig

And then, IMCO delivered.
12" extension box with 3" lift and external full hydraulic steering. Great stuff. Best company we have dealt with by far!! I´ll post a "review" of all the parts suppliers after the boat is finished, but IMCO will top that list, no doubt.
Bilge is also almost finished, the pumps would have kept the titanic floating...
Decided to make the engine mounts myself and hard-core; also with polyurethane sealer for even distribution of the stess exerted by the bolts through the stringers, heavy backing plates.
Attached Images
File Type: jpg bild40.jpg (29.1 KB, 7 views)
File Type: jpg bild41.jpg (21.6 KB, 5 views)
File Type: jpg bild42.jpg (18.1 KB, 12 views)

Last edited by syclone; 08-03-2004 at 06:39 PM.
syclone is offline   Reply With Quote
Old 08-03-2004, 06:44 PM   #27
Registered
Gold Member
 
syclone's Avatar
 
Join Date: Feb 2004
Location: Vienna/Austria
Posts: 70
Re: ´95 Scarab 22 Re-Rig

Spraying the deck; the green stuff is polyvinyl alcohol, which is sprayed on some 20 minutes after the gelcoat is mixed, it should produce a dry surface by preventing the waxes to rise to the surface (or whatever it does) and make it sticky ; works quite well, still needs some washing with solvent before sanding. Courtesy of www.fibreglast.com
Attached Images
File Type: jpg bild43.jpg (17.4 KB, 5 views)
syclone is offline   Reply With Quote
Old 08-03-2004, 06:46 PM   #28
Registered
Gold Member
 
syclone's Avatar
 
Join Date: Feb 2004
Location: Vienna/Austria
Posts: 70
Re: ´95 Scarab 22 Re-Rig

Now that´s a poor attempt to fabricate a new dash. very embarrassing result.
next pic much better: making a mold from styropor, cover it with separating film an there you are.
Attached Images
File Type: jpg bild44.jpg (23.7 KB, 7 views)
File Type: jpg bild45.jpg (22.7 KB, 6 views)
File Type: jpg bild46.jpg (16.1 KB, 4 views)
syclone is offline   Reply With Quote
Old 08-03-2004, 06:47 PM   #29
Registered
Gold Member
 
syclone's Avatar
 
Join Date: Feb 2004
Location: Vienna/Austria
Posts: 70
Re: ´95 Scarab 22 Re-Rig

Dash taking shape
Attached Images
File Type: jpg bild47.jpg (18.5 KB, 6 views)
syclone is offline   Reply With Quote
Old 08-03-2004, 06:48 PM   #30
Registered
Gold Member
 
syclone's Avatar
 
Join Date: Feb 2004
Location: Vienna/Austria
Posts: 70
Re: ´95 Scarab 22 Re-Rig

And then Eddie Marine delivered...
Attached Images
File Type: jpg bild48.jpg (25.0 KB, 5 views)
File Type: jpg bild49.jpg (25.7 KB, 6 views)
syclone is offline   Reply With Quote
 
 
 
 
 
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
New Rig Magicfloat Formula 22 08-21-2008 10:03 AM
I got a new tow rig for the Scarab for Christmas!!! SANLEONKID Trucks, Trailers and Transportation 10 01-10-2008 11:18 PM
Trade wanted - my 100mph 38 Scarab for your mid/late 90's 38 Scarab jody165 Scarab 3 08-31-2005 01:32 PM
Lost Scarab keys in desert north of Reno, need Scarab expert! terrygar General Boating Discussion 4 08-08-2005 06:11 PM


All times are GMT -5. The time now is 06:19 PM.


Copyright 2011 OffShoreOnly. All rights reserved.

Search Engine Optimization by vBSEO 3.2.0