![]() |
Winter project '02 TG - DONE!!!!
3 Attachment(s)
This weekend I'll put a few more touches on the TG. But for the most part I am DONE. I do have to say the boat looks like "my" boat now, and it looks 95% like a new boat off the showroom floor. Here is a list of what has been done and a few pics:
Replace throttle cables w/ supreme 33C Replace Trim Tab cables w/ supreme 33C Paint rear rails and rail supports around hatch Paint front rail Refinish rail spacers Paint bolster bases w/ red to yellow fade Paint grab handles w/ red to yellow fade and "Cig" logo Paint dashes done by Mitcher-T Gauges gedone f/ Platinum to chrome super bezels Replace Garmin 185 w/ 192C Replace purple bezels w/ new ones Replace circuit breaker covers w/ new Replace switch boots w/ new Re-caulk diamond plate Remove lousy Alpine amp and install old school Soundstreams Replace cabin door gasket Fix stbd side panel - was loose PowderCoat rear seat degree brackets PowderCoat rear vent on engine hatch Powercoat screens on engine hatch Paint underside of wind deflectors w/ graphic Paint trim tabs - added slight graphic Detail outdrives Paint all paint chips Re- Clear hull sides Buff FG in cockpit Install hatch gasket clean up stereo wiring re-do trim indicators - added springs & index Replace Spark Plugs Replace cap & Rotor Replace horn Fix FG for head hinges Replace float switch covers Refinish large fuel valves access hatch Bezels on cup holders - waiting f/ Bezels Bezels on small hatch’s in motor box Install Documentation #’s Install Head Replace bent hatch keeper Put protective paint film on bolsters base Check Drives for alinement Repaint throttle/shifter bases - Mitcher-T Clean forward bilge's Clean carpets Have red trim installed on cabin seat cushions Replace blower hoses in bilge Replace cockpit carpet New cockpit cover New Mooring cover - both done by Sunrise Uph Add filter for air intakes Re-do embroidery "Top Gun" logo on bolsters Re-Do embroidery "Cigarette" logo above door. Add threaded brass inserts in dash and glue in. Re-Place speakers Re-Place cockpit lights New CMI Headers New Starter port motor New ring gear on stbd flywheel New Odessey Batteries Plus alot of little nic - nack stuff that was done "on the fly" and I simply can't remember. Whew! That's about 99% of it. |
Re: Winter project '02 TG - DONE!!!!
1 Attachment(s)
One more of the motors and new CMI's.
I'll take some pics today. |
Re: Winter project '02 TG - DONE!!!!
Job well done! That boat looks greattt!!
|
Re: Winter project '02 TG - DONE!!!!
Wow!! What a list.Sounds like you shaped that boat into a 10.
Good luck with it and enjoy. |
Re: Winter project '02 TG - DONE!!!!
That's quite a list Bill!!!! Are you sure that you didn't miss anything?? :D :drink:
Congrats...The boat looks AWESOME!!!!! |
Re: Winter project '02 TG - DONE!!!!
3 Attachment(s)
I am sure I did miss a few things.
Now that I have this pic of the stern, memory gets a jolt: I replaced the drive shower hoses, checked drive alignment, took apart all the stainless pieces and buffed them out, had the tabs and tab mounts clear coated. . . . . . . More pics of the motor box. If you look close, check out the shine. :drink: :D :evilb: |
Re: Winter project '02 TG - DONE!!!!
1 Attachment(s)
Now that is a Frenzy shine. The detailers here locally have been SO impressed with Frenzy, our marina now sells the product. But they sell out very quickly.
|
Re: Winter project '02 TG - DONE!!!!
you love that boat :D
|
Re: Winter project '02 TG - DONE!!!!
Originally Posted by pm203
Wow!! What a list.Sounds like you shaped that boat into a 10.
Good luck with it and enjoy. Sounds like it's a 12 to me ! L.S. |
Re: Winter project '02 TG - DONE!!!!
Despite the list, the boat was in VERY good condition to begin with. Most (99%) of the items on the list were not necessary, but I wanted to change / update / preventive maintanance things.
Now it looks like a boat I just bought off the showroom and has "my" touches! |
Re: Winter project '02 TG - DONE!!!!
1 Attachment(s)
Boat looks awesome Bill. I just got mine two weeks ago and have not been able to run it but once. Weather here has not been good, and is down in the 50's this weekend.
The 575's run better than I expected, great package. Have fun with your (new ride). |
Re: Winter project '02 TG - DONE!!!!
Rigging looks top notch Great ride.
|
Re: Winter project '02 TG - DONE!!!!
Wow! Heck of a job there.
|
| All times are GMT -5. The time now is 02:20 AM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.