Offshoreonly.com

Offshoreonly.com (https://www.offshoreonly.com/forums/)
-   Cigarette (https://www.offshoreonly.com/forums/cigarette-32/)
-   -   Winter project '02 TG - DONE!!!! (https://www.offshoreonly.com/forums/cigarette/100803-winter-project-02-tg-done.html)

BillR 04-16-2005 08:04 AM

Winter project '02 TG - DONE!!!!
 
3 Attachment(s)
This weekend I'll put a few more touches on the TG. But for the most part I am DONE. I do have to say the boat looks like "my" boat now, and it looks 95% like a new boat off the showroom floor. Here is a list of what has been done and a few pics:

Replace throttle cables w/ supreme 33C
Replace Trim Tab cables w/ supreme 33C
Paint rear rails and rail supports around hatch
Paint front rail
Refinish rail spacers
Paint bolster bases w/ red to yellow fade
Paint grab handles w/ red to yellow fade and "Cig" logo Paint dashes done by Mitcher-T
Gauges gedone f/ Platinum to chrome super bezels
Replace Garmin 185 w/ 192C
Replace purple bezels w/ new ones
Replace circuit breaker covers w/ new
Replace switch boots w/ new
Re-caulk diamond plate
Remove lousy Alpine amp and install old school Soundstreams
Replace cabin door gasket
Fix stbd side panel - was loose
PowderCoat rear seat degree brackets
PowderCoat rear vent on engine hatch
Powercoat screens on engine hatch
Paint underside of wind deflectors w/ graphic
Paint trim tabs - added slight graphic
Detail outdrives
Paint all paint chips
Re- Clear hull sides
Buff FG in cockpit
Install hatch gasket
clean up stereo wiring
re-do trim indicators - added springs & index
Replace Spark Plugs
Replace cap & Rotor
Replace horn
Fix FG for head hinges
Replace float switch covers
Refinish large fuel valves access hatch
Bezels on cup holders - waiting f/ Bezels
Bezels on small hatch’s in motor box
Install Documentation #’s
Install Head
Replace bent hatch keeper
Put protective paint film on bolsters base
Check Drives for alinement
Repaint throttle/shifter bases - Mitcher-T
Clean forward bilge's
Clean carpets
Have red trim installed on cabin seat cushions
Replace blower hoses in bilge
Replace cockpit carpet
New cockpit cover
New Mooring cover - both done by Sunrise Uph
Add filter for air intakes
Re-do embroidery "Top Gun" logo on bolsters
Re-Do embroidery "Cigarette" logo above door.
Add threaded brass inserts in dash and glue in.
Re-Place speakers
Re-Place cockpit lights
New CMI Headers
New Starter port motor
New ring gear on stbd flywheel
New Odessey Batteries
Plus alot of little nic - nack stuff that was done "on the fly" and I simply can't remember.

Whew! That's about 99% of it.

BillR 04-16-2005 08:06 AM

Re: Winter project '02 TG - DONE!!!!
 
1 Attachment(s)
One more of the motors and new CMI's.

I'll take some pics today.

mcraymond3 04-16-2005 08:33 AM

Re: Winter project '02 TG - DONE!!!!
 
Job well done! That boat looks greattt!!

pm203 04-16-2005 09:07 AM

Re: Winter project '02 TG - DONE!!!!
 
Wow!! What a list.Sounds like you shaped that boat into a 10.
Good luck with it and enjoy.

OldSchool 04-16-2005 09:30 AM

Re: Winter project '02 TG - DONE!!!!
 
That's quite a list Bill!!!! Are you sure that you didn't miss anything?? :D :drink:

Congrats...The boat looks AWESOME!!!!!

BillR 04-16-2005 03:50 PM

Re: Winter project '02 TG - DONE!!!!
 
3 Attachment(s)
I am sure I did miss a few things.
Now that I have this pic of the stern, memory gets a jolt: I replaced the drive shower hoses, checked drive alignment, took apart all the stainless pieces and buffed them out, had the tabs and tab mounts clear coated. . . . . . .

More pics of the motor box. If you look close, check out the shine. :drink: :D :evilb:

BillR 04-16-2005 03:54 PM

Re: Winter project '02 TG - DONE!!!!
 
1 Attachment(s)
Now that is a Frenzy shine. The detailers here locally have been SO impressed with Frenzy, our marina now sells the product. But they sell out very quickly.

plasterd 04-16-2005 04:44 PM

Re: Winter project '02 TG - DONE!!!!
 
you love that boat :D

lucky strike 04-16-2005 04:59 PM

Re: Winter project '02 TG - DONE!!!!
 

Originally Posted by pm203
Wow!! What a list.Sounds like you shaped that boat into a 10.
Good luck with it and enjoy.


Sounds like it's a 12 to me !

L.S.

BillR 04-17-2005 06:55 AM

Re: Winter project '02 TG - DONE!!!!
 
Despite the list, the boat was in VERY good condition to begin with. Most (99%) of the items on the list were not necessary, but I wanted to change / update / preventive maintanance things.
Now it looks like a boat I just bought off the showroom and has "my" touches!

twin screws 04-23-2005 07:58 AM

Re: Winter project '02 TG - DONE!!!!
 
1 Attachment(s)
Boat looks awesome Bill. I just got mine two weeks ago and have not been able to run it but once. Weather here has not been good, and is down in the 50's this weekend.
The 575's run better than I expected, great package. Have fun with your (new ride).

RUSSSR1 04-23-2005 09:16 AM

Re: Winter project '02 TG - DONE!!!!
 
Rigging looks top notch Great ride.

Chart 04-23-2005 09:17 AM

Re: Winter project '02 TG - DONE!!!!
 
Wow! Heck of a job there.


All times are GMT -5. The time now is 02:20 AM.


Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.