Cigarette Topgun
#1354
Thread Starter
Registered

Joined: Mar 2013
Posts: 1,003
Likes: 895
From: Cleveland ohio
lol I get it. Been working on a lot almost every evening. It’s in the stage of tons of small stuff before final assembly. Realistically hoping for floating test and stb engine test 3rd week in June. I left the port Moter out so I can really have room to check everything for water leaks etc. hoping to drop port engine in early July and spend a 2 weeks doing some final stuff the do some water testing late July. Over the winter I can tinker with final stuff. Some of the small project really take a long time and they add up. I have a few days just in new water pic ups and strainer plumbing. Crazy how time adds up
#1356
Registered

Joined: Nov 2009
Posts: 4,198
Likes: 500
From: KY
Very nice, if pickups are an issue later look at how this guy did his
https://cimg7.ibsrv.net/gimg/www.off...fb939b2931.jpg
https://cimg7.ibsrv.net/gimg/www.off...fb939b2931.jpg
#1359
Registered

Joined: Jan 2010
Posts: 617
Likes: 144
From: syracuse ny










