![]() |
Update Pics of Progress
1 Attachment(s)
Just posting progress of where we are with the 37 Scorpion. Slow, but getting there.
|
1 Attachment(s)
Dash and cabin. Going to insall roll up tambor doors for the cabin entry.
|
Gauges. Autometer silver and carbon. Eddie Marine Trim Indicator
|
3 Attachment(s)
Gauges
|
2 Attachment(s)
Switch Panel in plexiglass. Going to do a silver carbon fiber switch panel with blue switch bezels.
|
2 Attachment(s)
Carbon Fiber Air inlet. Does anyone know were i can find some stainless steal mesh?
|
1 Attachment(s)
Working on door frames for the roll up cabin door.
|
2 Attachment(s)
Engine Rm
|
Looks good so far....What are you going to power it with?
Make sure you are done by April! |
Congrats, and I'm looking forward to future pics!
|
| All times are GMT -5. The time now is 08:58 AM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.