![]() |
Avanti progress
Damn lot of work! replaced all the switches and chased various electrical gremlins, new led courtesy lights, new bilge lights, Made new bolsters, made new mounting box for controls and replaced controls. Replaced trim pump, and replaced a tab actuator. Replaced trim and tab rockers. New bilge pump and float switch ready to go in. Repainted windshield frame, compounded buffed and waxed hull, Replaced bent rusted eagle trailer with a Myco. Time to start buttoning things up
|
Originally Posted by phragle
(Post 3936380)
Damn lot of work! replaced all the switches and chased various electrical gremlins, new led courtesy lights, new bilge lights, Made new bolsters, made new mounting box for controls and replaced controls. Replaced trim pump, and replaced a tab actuator. Replaced trim and tab rockers. New bilge pump and float switch ready to go in. Repainted windshield frame, compounded buffed and waxed hull, Replaced bent rusted eagle trailer with a Myco. Time to start buttoning things up
|
| All times are GMT -5. The time now is 02:30 PM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.