New Saber Marine 28 Build
1 Attachment(s)
Follow along as Saber builds a new 2014 Saber 28 Offshore.[ATTACH=CONFIG]507245[/ATTACH]
Hull Mold waxed and ready to go. |
1 Attachment(s)
White gelcoat sprayed and mat skincoat.[ATTACH=CONFIG]507246[/ATTACH]
|
1 Attachment(s)
Biaxial cloth over everything and scuffing up surface for next layer.[ATTACH=CONFIG]507247[/ATTACH]
|
2 Attachment(s)
[ATTACH=CONFIG]507249[/ATTACH]Filling strakes with high impact strength putty.[ATTACH=CONFIG]507248[/ATTACH]
|
1 Attachment(s)
Laying out Balsa core for sides.[ATTACH=CONFIG]507250[/ATTACH]
|
1 Attachment(s)
Side balsa bedded into chop strand mat.[ATTACH=CONFIG]507251[/ATTACH]
|
1 Attachment(s)
Balsa installed on sides; fitting up bottom.[ATTACH=CONFIG]507252[/ATTACH]
|
3 Attachment(s)
Balsa installed and hot coated over with resin.[ATTACH=CONFIG]507253[/ATTACH][ATTACH=CONFIG]507254[/ATTACH][ATTACH=CONFIG]507255[/ATTACH]
|
Awesome.
|
Originally Posted by saber marine
(Post 3986594)
Follow along as Saber builds a new 2014 Saber 28 Offshore.[ATTACH=CONFIG]507245[/ATTACH]
Hull Mold waxed and ready to go. |
All times are GMT -5. The time now is 02:45 AM. |
Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.