![]() |
Add steps to lift bunks
So I have to modify the bunks on my boat lift to accept the stepped hull of a 35' Donzi. They are currently wood (double 2X12's). Not sure if I should add material on top are cut material away with the old skil saw. Anyone do this before and can offer some advice?
|
My trailer has a double plank to fill the step area. The area forward of the step is single plank.
|
Add on top. Just countersink the screws. (use stainless steel screws)
|
Just did this myself a few months ago . Added layers over the existing bunks. Use a straight edge and measure you step heights to get the correct thickness. You may have to rip some 2 by's to get the correct thickness , I did . Came out great , fit perfect on the first attempt . One thing I can say is measure everything at LEAST twice . I also had to change the spacing of the bunks off center to fit the new boat . Check that too . Good luck !
|
2 Attachment(s)
Here's a couple pictures of the lift bunks for my twin stepped 292.
[ATTACH=CONFIG]528299[/ATTACH][ATTACH=CONFIG]528300[/ATTACH] |
Nice, thanks everyone. I'm just going to add to the top. The Donzi has a 2-1/2" front step and a 2" rear so I'll need to raise it 4-1/2", drop it down to 2-1/2" and then straight for the rest.
|
| All times are GMT -5. The time now is 05:14 PM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.