bajaman 08-10-2022 05:15 PM

Mirage prop not available until June 2023???
 
Ok, wow...was I floored when I got a note from the popular boating website that the Mirage Plus 21" pitch prop was a "special order" and not available until next year???
WTF?

SB 08-10-2022 08:53 PM


Originally Posted by bajaman (Post 4841133)
Ok, wow...was I floored when I got a note from the popular boating website that the Mirage Plus 21" pitch prop was a "special order" and not available until next year???
WTF?

Some oe auto parts been on back order for well over a year.

Baja_260 08-10-2022 08:54 PM


Originally Posted by bajaman (Post 4841133)
Ok, wow...was I floored when I got a note from the popular boating website that the Mirage Plus 21" pitch prop was a "special order" and not available until next year???
WTF?

That’s a crazy lead time! I think I have one sitting around from a previous boat. PM me if interested.

Rookie 08-11-2022 07:22 PM

There's about a dozen of them on Ebay. New and used.

xlint89 08-11-2022 10:36 PM

Had a used 21p RH with removable hub included for $200. Was listed for 2 weeks.

TeamSaris 08-12-2022 08:22 AM

Everything to do with stainless steel has a hefty lead time. CMI headers are 6-8months out. Props. Everything.

Wildman_grafix 08-12-2022 10:27 AM


Originally Posted by TeamSaris (Post 4841358)
Everything to do with stainless steel has a hefty lead time. CMI headers are 6-8months out. Props. Everything.

I am in a totally unrelated field and we have had two vendors cancel orders for SS NEMA 4 cabinets. Lead times to long and price to unstable.

DallasBAJA 08-12-2022 10:29 AM


Originally Posted by Wildman_grafix (Post 4841377)
I am in a totally unrelated field and we have had two vendors cancel orders for SS NEMA 4 cabinets. Lead times to long and price to unstable.

I work in IT consulting and to get pretty much any switching infrastructure we are 280 days out. Routing and firewalls are over 150 days. Its wild.

bajaman 08-12-2022 05:00 PM

lol...and 6 months ago I saw the auction sheet for a local, once very large dealership that had shutdown after the longtime owner had died.
Guess what was on it?

SB 08-12-2022 05:04 PM

I have a 23” mirage plus that i have no use for currently.