![]() |
Originally Posted by Rookie
(Post 4258426)
The wedges are first expoxied in, then drilled and tapped from the bottom then affixed with a bolt that is red loctited or expoxied in. This is the process for steel GM and steel Merlins. He has wedges for both.
|
On the bottom of the intake ports on the iron head pic. They reduce the port size for increased velocity and a raised floor gives it a better flow.
|
| All times are GMT -5. The time now is 11:32 PM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.