![]() |
Is the floor gravel. Are the main posts cemented in the ground? The eave looks higher than 9' compared to that 10' door. $4000.00 installed. WOW!!:drool:
|
Right now the floor is gravel, but I'm going to pour a slab later on this summer. This building a tube frame at the bottom and they drive 3'-0 long rebar into the ground. The door is actually 10' but the opening is only 9'-6 and with the door all the way up I have 9'-4 clear.
|
Congrats. Nice bldg. & price!
|
Very nice...I need to get one of those for my girl. Right now she shares space with about 25 other girls.
|
| All times are GMT -5. The time now is 01:43 PM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.