A few winter upgrades are done....
#1
Thread Starter
Registered

Joined: Aug 2001
Posts: 14,576
Likes: 4,563
From: Channel Islands, So. Cal.
New step rails, fire extinguishers and glove box...
Rails..Before with that "sandpaper" grip..
During installation..Had to sand down some of the grip that was exposed.
Installed. Screws are counter sunk but I think I need to touch them up with some white paint...
Rails..Before with that "sandpaper" grip..
During installation..Had to sand down some of the grip that was exposed.
Installed. Screws are counter sunk but I think I need to touch them up with some white paint...
#6
Thread Starter
Registered

Joined: Aug 2001
Posts: 14,576
Likes: 4,563
From: Channel Islands, So. Cal.
Lisa and the girls were over last night for cocktails. Lisa was sobbing because you weren't there!
Last edited by thisistank; 04-12-2008 at 03:52 PM.
#7
#8
whats real, and what are stickers.. we need to know... tell us before we hurt you, and whatever work was not done by phil, its junk.. straight up garbage.. so tell us the truth, if you lie i will find out... your pal stecz
#9
Registered
Joined: Jan 2006
Posts: 179
Likes: 2
From: brick nj
looks great what material did you use for the side rails? one of mine has a crack near one fo the screws and would love to replace it, phil said the guy that used to make them does not do it . any info will help thx, greg
#10
Winter upgrade, that is funny.
I spent all winter hanging out at the marina getting it ready for everybody else.
The upgrades look great.
I would like to get the thunder boat plackard for my boat.
I spent all winter hanging out at the marina getting it ready for everybody else.
The upgrades look great.
I would like to get the thunder boat plackard for my boat.
Last edited by dnebo; 04-12-2008 at 07:16 PM.



