Will only let me use 5 images per post so here is a little background info on the previous posts
Removing the old transom. Almost finished. Notice the line of resin oround the outside of where the old transom was. This is the "gap" that is needed. Grind out the old, in with the new. http://i86.photobucket.com/albums/k9...t/P1030323.jpg Here is the biax I used before installing the transom piece. http://i86.photobucket.com/albums/k9...t/P1030375.jpg And wetted out with epoxy http://i86.photobucket.com/albums/k9...t/P1030377.jpg I used what was left of the centre two stringers, some string, braces and cross members to "recreate" the bottom of the old floor level. http://i86.photobucket.com/albums/k9...t/P1030370.jpg http://i86.photobucket.com/albums/k9...t/P1030371.jpg The level is the underside of the 1x4s and the pink string. I then marked the hull with a permanent marker once I was satisfied. |
Laminated stringers with 3/4" coosa bluewater 26.
http://i86.photobucket.com/albums/k9...t/P1030522.jpg Measurements from under the pink string and transferring them to stringers http://i86.photobucket.com/albums/k9...t/P1030524.jpg Cut stringers that had to be put in place and trimmed to fit. Much trial and error fitting. http://i86.photobucket.com/albums/k9...t/P1030528.jpg Made some bracing to hold the spacing between the stringers properly. http://i86.photobucket.com/albums/k9...t/P1030530.jpg In place and checked with jig. http://i86.photobucket.com/albums/k9...P1030533-1.jpg |
Epoxy and wood flour to glue the stringers down. I also used some silvertip ezfillit but it gets expensive fast, but it did show me the proper consistency to get the mixture to.
http://i86.photobucket.com/albums/k9...t/P1030537.jpg Glued down http://i86.photobucket.com/albums/k9...t/P1030545.jpg Smaller second set of stringers. http://i86.photobucket.com/albums/k9...t/P1030539.jpg Glued down in place. http://i86.photobucket.com/albums/k9...P1030546-2.jpg I used a straight edge to get the stringers level, using the marks I had made with the jig that delineated the bottom of the floor. I let the first two cure before installing the second two. |
Awesome Mtnrat. Keep it coming it is very informative. You wouldn't be planning a trip to Oz in the near future by any chance?
|
Check out my other post tripps
|
All i can say is that i painted the transom,mounted the bracket,the motas are goin on this week and the riggin done correctly by Marine 2000,and the rest is up 2 me!!! tripps
|