Standard time to remove/install 502's

Notices

Standard time to remove/install 502's

Thread Tools
 
Old 06-02-2011 | 09:14 PM
  #1  
Thread Starter
Registered
 
Joined: May 2007
Posts: 4
Likes: 0
Default Standard time to remove/install 502's

I would like to know the standard time to remove and replace a 502 engine from a Fountain. There are 2 of them in the boat!
jbpeterson1 is offline  
Reply
Old 06-02-2011 | 09:20 PM
  #2  
Registered
15 Year Member
 
Joined: Apr 2008
Posts: 359
Likes: 7
From: Aledo,Texas
Default

Originally Posted by jbpeterson1
I would like to know the standard time to remove and replace a 502 engine from a Fountain. There are 2 of them in the boat!

When ur compression gets low.
dewayne6243 is offline  
Reply
Old 06-02-2011 | 09:35 PM
  #3  
Banned
 
Joined: Apr 2008
Posts: 2,004
Likes: 0
From: Boca/Brentwood
Default

16 hours?
PARADISE ISLAND is offline  
Reply
Old 06-02-2011 | 10:13 PM
  #4  
Registered
15 Year Member
 
Joined: Apr 2008
Posts: 359
Likes: 7
From: Aledo,Texas
Default

Originally Posted by PARADISE ISLAND
16 hours?

Sounds about right

Last edited by dewayne6243; 06-03-2011 at 03:34 PM.
dewayne6243 is offline  
Reply
Old 06-03-2011 | 11:05 AM
  #5  
Registered
 
Joined: Jul 2009
Posts: 1,592
Likes: 3
From: Owensboro, KY
Default

Pulling the motors is generally pretty quick...its getting everything disconnectd thats slow and removing the hatch if needed. If yours has the scissor hatch you should be ok. I have never pulled motors on a fountain but have pulled twins on several other boats and it usually takes about 4-6 hours the first time around. First motor is much harder than the second.
FuelinAround is offline  
Reply
Old 06-03-2011 | 01:10 PM
  #6  
Fountain4402's Avatar
Banned
 
Joined: May 2010
Posts: 861
Likes: 0
From: New York
Default

i woul say a day your first time. It all depends on what kind of lift you got and how many buddies. OTher than that its motor mounts and un-plugging everything. I would figure on a good saturday first time.
Fountain4402 is offline  
Reply
Old 06-05-2011 | 01:44 AM
  #7  
Registered
 
Joined: Dec 2008
Posts: 133
Likes: 0
From: NOVA V.A.
Default

If done at a marina Would say 8 hours per engine at most FRL time.
10K4U is offline  
Reply

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.