![]() |
1 Attachment(s)
I have most the wiring and plumbing done, I still have to put in the big sea strainers and re work the battery area. The amount of wires and hose really makes it look messy bu I am not about to re invent the wheel.
I did add a connection to the freshwater flush system to the generator. I am still waiting on the valve to ship. Doesn't make sence that fountain would leave this out. |
1 Attachment(s)
Another
|
1 Attachment(s)
Strainers are mounted, I need to plumb next. Boy that 3rd one took some figuring. no room in the front of the center engine.
|
Hey Ray,
When are you going to put those engines in? And get that bad boy in the water |
You are doing an incredible job. That is a tremendous amount of wires & hoses!
|
Thanks, I'm off to Ft Lauderdale and Aruba for a week. So no work on the 47 for a while. When I get back I will finalize the bilge and be ready to drop the engines in.
|
Wow, thats lookin real nice.
:cool: |
Real nice Ray. :)
|
1 Attachment(s)
Here are some progress pictures. I am having Rod (RPM) at Performance Marine in WI. Finish up the engine and drive installation as well as a few upgrades - Pre Lubers and water pressure relief valves. Pictures are from Rod:
|
1 Attachment(s)
2
|
| All times are GMT -5. The time now is 12:02 AM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.