Progress reports.........
#11
Originally Posted by tomtbone1993
what else are you guys working on????

right now just got done tearing down 4) 7.4 mtrs for rebuilds. just finished assbling 2) 5.7 s and have 1) omc cobra drive to rebuild 1) bravo 3 to rebuild 1) alpha to rebuild
Thats what im working on so far (this week)
#12
Originally Posted by pullmytrigger
go tthe new smallblocks for the boat......they.ve been all freshened and are going on the dyno on Apr 14.......Ive decided on purple paint .....will contrast nice with the chrome exhaust and accesories.......For the shop, I have the drawings back from the architecht.......am waiting on engineered truss drawings from the truss manufacturer then I can submit the drawings to the town for approval and get a building permit.......then start diggin'
That's a really sharp Fountain. I really like how you did the numbers and the side graphics.
#13
Rear bench dropped at Al's Custom Upholstery for a few fixes.
Couple sets of props out at BBlades for freshening and mods.
Trailer bunks being replaced this weekend at Pro-Lite.
Everything is cosmetic or for improvements only....its a good place to be for me this time of year
Couple sets of props out at BBlades for freshening and mods.
Trailer bunks being replaced this weekend at Pro-Lite.
Everything is cosmetic or for improvements only....its a good place to be for me this time of year
#16
1. Putting my exhaust back together as soon as the welder finishes my tailpipes.
2. Rigging switchable mufflers that have been sitting in my garage for a year. Installed the pump last week but still need to do the wiring and plumbing.
3. Installing and rigging the steering for the new drives.
4. Turning the wick up on the motors.
With some luck I'll be in the water by the 3rd - 4th week of April assuming my drives arrive and tailpipes get finished on time..
2. Rigging switchable mufflers that have been sitting in my garage for a year. Installed the pump last week but still need to do the wiring and plumbing.
3. Installing and rigging the steering for the new drives.
4. Turning the wick up on the motors.
With some luck I'll be in the water by the 3rd - 4th week of April assuming my drives arrive and tailpipes get finished on time..
#17
Originally Posted by gotime34
I'm doing an entire transom and stringer replacement right now, its like having a second job. JC Perf is putting my engines back together next week. Doing a bunch of minor upgrades during all of it. Hopefully testing by the end of the month.

~~edit~~
"I'm" (not me actually
) doing motors x 2 ... rear transom all hardware pulled and re-painted ... sea strainers ... etc etc ... Ready by??? Hopefully May 1 
Panther, come on Mr. V is waiting to play on the river
Good luck with the new drives ... and steering project bud.
~~end-edit~~
Last edited by NJgr8ful; 04-05-2006 at 07:39 PM.
#19
Originally Posted by Panther
1. Putting my exhaust back together as soon as the welder finishes my tailpipes.
2. Rigging switchable mufflers that have been sitting in my garage for a year. Installed the pump last week but still need to do the wiring and plumbing.
3. Installing and rigging the steering for the new drives.
4. Turning the wick up on the motors.
With some luck I'll be in the water by the 3rd - 4th week of April assuming my drives arrive and tailpipes get finished on time..
2. Rigging switchable mufflers that have been sitting in my garage for a year. Installed the pump last week but still need to do the wiring and plumbing.
3. Installing and rigging the steering for the new drives.
4. Turning the wick up on the motors.
With some luck I'll be in the water by the 3rd - 4th week of April assuming my drives arrive and tailpipes get finished on time..

#20
Originally Posted by masher44
Blaster is ready for Slim. Going in on Monday
Pics tomorrow.
Trailer has been adjusted and boat moved forward 40 inches.
TBone- Glad to hear your sh1t pail might see the water this year
Pics tomorrow.Trailer has been adjusted and boat moved forward 40 inches.
TBone- Glad to hear your sh1t pail might see the water this year





