![]() |
Originally Posted by Payton
(Post 3928082)
Wow, I can't wait to see her.
|
Final Touches
10 Attachment(s)
Decided to polish the 1991 Bomar hatch and make it look new again. The ITC indirect lighting worked really well, and I think we talked Mark into a new stainless steel style rub-rail. Too many old gaps.
XT |
All Done in the Cabin!
8 Attachment(s)
Here are the final cabin area photos.
XT |
All New Cockpit Design
7 Attachment(s)
Well the Cockpit is all finished also. The new designed bolsters are electric drop bottoms and feel great. Rear seating was raised and widened for better confort.
XT |
Wow. Looks great
|
Good Bye Super Sweet
7 Attachment(s)
Mark, I bet she is more fun in the summer for you than for me over the winter. Lol
Thanks for being such a great customer. I will get that new cockpit carpet on order ASAP. Thanks, again Dave, Lane, Bev, Rusty, & Bill |
Wow, and those pics still don't do those colors justice. The purple doesn't show in pics very well for some reason. and the little mettle flacks don't show either. I love the interior
Great Work Dave and crew.. |
she looks great, it is amazing how someone with talent and vision can turn a 20 year old boat into something that looks better than most brand new ones. great to see the old girl with a new life.
|
1 Attachment(s)
[ATTACH=CONFIG]503169[/ATTACH]+1 The only way I can tell that is a Super Hawaii is by the engine vents. That's saying a lot because my neighbor has one in his driveway. Randy
|
Thanks for the comments.
The job just kept kind of growing. And, I love all the work they did. It's funny, it was 9 months almost to the day, and now my baby is home. I've got her almost ready for the water. Next week we put the lift in.. |
| All times are GMT -5. The time now is 10:17 AM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.