The project begins
#21
Very nice work.
Next dash I do, I am going to make up a template of the with all the gauges and switches and wire that on my bench. When I can get as far as I can I will transfer the loom to the boat and finish it. Never done this but that is how manufacturers do it. Sure would be easier on the body.
Next dash I do, I am going to make up a template of the with all the gauges and switches and wire that on my bench. When I can get as far as I can I will transfer the loom to the boat and finish it. Never done this but that is how manufacturers do it. Sure would be easier on the body.
#22
Did a little plumbing today. The box is installed, the hydraulic steering is almost done, the gauges are installed and the boat is wired. The bilge pumps are glued in place ( all three ) Tomorrow I install the canopies and the rub rail. Next week I should get my engine parts back from the machine shop. ( it took forever to get the crank from CROWER )
[ATTACH=CONFIG]542971[/ATTACH]
[ATTACH=CONFIG]542971[/ATTACH]
#23
Wow it is heard to form 3/16 stainless tubing. And flaring it was no fun either. Only had to re bend one of them a little.
That picture is from inside the box. Looking through the outdrive opening.
That picture is from inside the box. Looking through the outdrive opening.
Last edited by Tinkerer; 07-11-2015 at 09:30 PM.
#26
Brought a few parts home today. The block is still in the back of the van. I need help to get it out.
[ATTACH=CONFIG]543216[/ATTACH]
[ATTACH=CONFIG]543217[/ATTACH]
[ATTACH=CONFIG]543218[/ATTACH]
[ATTACH=CONFIG]543216[/ATTACH]
[ATTACH=CONFIG]543217[/ATTACH]
[ATTACH=CONFIG]543218[/ATTACH]




