That was not poor rigging, that was structural failure of lifting hook mount.
The rigging was at a very minimal angle more than sufficient to safely lift up without putting a lateral load on the lifting points or needing a spreader bar.
You can hear the bulkhead and deck popping right before it lets go.
There is even a section of the boat that pulls out with the rigging.
I know a little something about rigging.
The rigging was at a very minimal angle more than sufficient to safely lift up without putting a lateral load on the lifting points or needing a spreader bar.
You can hear the bulkhead and deck popping right before it lets go.
There is even a section of the boat that pulls out with the rigging.
I know a little something about rigging.
#23
Registered

Joined: Oct 2007
Posts: 8,439
Likes: 93
From: yorkville,il
i was thinking the same thing,it seems to me like it would be quicker to back the trailer in and drive it off than lifting&setting it into the water.
#24
Registered
Joined: Jul 2008
Posts: 225
Likes: 0
LIFT POINTS, hardware, materials, center of gravity, load capacity, tag lines etc are all considered rigging.
Failed RIGGING was to blame when a lift point broke free from the load the crane was attempting to pick.
You a crane hand as well Tom?
Failed RIGGING was to blame when a lift point broke free from the load the crane was attempting to pick.
You a crane hand as well Tom?
#25
__________________
Throttles- Cleveland Construction 377 Talon
08 OPA Class 1 National Champion
08 Class 1 Geico Triple Crown Champion
08 OPA High Points Champion
10 OPA Class 1 National Champion ( happy now Ed! )
Throttles- Cleveland Construction 377 Talon
08 OPA Class 1 National Champion
08 Class 1 Geico Triple Crown Champion
08 OPA High Points Champion
10 OPA Class 1 National Champion ( happy now Ed! )
Last edited by glassdave; 06-27-2016 at 09:28 PM.
#26
As for the how far do you call it rigging, its really splitting hairs when the certified lifting hook or eye is still embedded in the material itself that gave way. We had a similar situation on a precast concrete section that broke free. The lifting eye was still firmly embedded in a chunk of concrete that sheared off do to what appeared to be an air pocket in the pour. The final analysis was the rigging was 100% and the material it was lifting failed. To me this is the same thing. If you pull out a piece of bulkhead, the boat failed not the rigging.
#28
Not a crane man here but I would think the load that was being applied to the hook not being a straight up load helped shear the bulkhead out of the boat.The bulkhead might have not given way if it was lifted straight up vs being pulled to the back of the boat
Tom, Your picture is lifting what looks like an I beam to me. I do not think there is a beam keeping the lifting points separate, is there?