Scarab 34 SS Project
#1
Registered
Thread Starter
Join Date: May 2005
Location: Tampa, Florida
Posts: 393
Likes: 0
Received 0 Likes
on
0 Posts
Scarab 34 SS Project
Somebody need to complete this project. I have replaced all the wood in the boat, Arjay was used in the transom and foam/glass on the stringers and flooring. The boat will be painted white, center console filled, painted, and mounted Cooler/seat painted and mounted, and it will be sitting on a completely refurbished Myco trailer. This hull is better than it ever was and you will have to get two, three, or four motors and mount it. Then mount the electrics/electronics and go boating. PVC pipes has been laid in to facilitate pulling cables/wires. Awesome project for the right person and if you're quick, we can even paint it in the color of your choice. Hull, Myco trailer, Kiekhaefer trim tabs, all new composite door and hatches, new windshield, all railings, new porta potty, and a myriad of other new parts will go for $20K, and not a penny less. I put way more than that in to it but we have decided to go with a bigger boat. Somehow I can't post attachments or I would have included lots of pictures. Email me at: [email protected] and I will forward pictures.