Notices

Scarab 34 SS Project

Thread Tools
 
Old 09-28-2017, 04:41 PM
  #1  
Registered
Thread Starter
 
Join Date: May 2005
Location: Tampa, Florida
Posts: 393
Likes: 0
Received 0 Likes on 0 Posts
Default Scarab 34 SS Project

Somebody need to complete this project. I have replaced all the wood in the boat, Arjay was used in the transom and foam/glass on the stringers and flooring. The boat will be painted white, center console filled, painted, and mounted Cooler/seat painted and mounted, and it will be sitting on a completely refurbished Myco trailer. This hull is better than it ever was and you will have to get two, three, or four motors and mount it. Then mount the electrics/electronics and go boating. PVC pipes has been laid in to facilitate pulling cables/wires. Awesome project for the right person and if you're quick, we can even paint it in the color of your choice. Hull, Myco trailer, Kiekhaefer trim tabs, all new composite door and hatches, new windshield, all railings, new porta potty, and a myriad of other new parts will go for $20K, and not a penny less. I put way more than that in to it but we have decided to go with a bigger boat. Somehow I can't post attachments or I would have included lots of pictures. Email me at: [email protected] and I will forward pictures.
Kims is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.