I run 30* all in timing. 177s, 9.5:1 compression w/ alum heads and 6psi. I have 2 - 3.0" original splined merc blower pulleys if anyone want to buy them.
|
|
Originally Posted by Itsallgood995
(Post 3607765)
|
Originally Posted by Griff
(Post 3608443)
That is larger than a stock pulley and I don't think anyone ever made any that were larger.
|
Convert over to the automotive keyed shaft and your pulley is a phone call to jegs or summit away. My opinion about what timing to run is this...My motor was run with retarded timing like around 30 total, and at about 140 hours (cant remember the exact meter reading) the exhaust valves were leaking badly. Retarded timing elevated the exhaust temps and ruined the valves. The Merc curve works very well and even though it has 35 deg total, its stepped and is not all in until 4500. Do not try to reinvent the wheel here.
|
Originally Posted by Itsallgood995
(Post 3608602)
My mistake, I was thinking the 177 & 250 pulleys were interchangeable. According to The Blower Shop the 250 is 16 rib & the 177 is 10 rib or keyed. That being said I have an old style (1.75” recessed) 16rib 2.75 for a 250 & need an old style 3.625 if anyone is interested or has one.
|
[QUOTE=Old Navy;3608633]Convert over to the automotive keyed shaft and your pulley is a phone call to jegs or summit away. My opinion about what timing to run is this...My motor was run with retarded timing like around 30 total, and at about 140 hours (cant remember the exact meter reading) the exhaust valves were leaking badly. Retarded timing elevated the exhaust temps and ruined the valves. The Merc curve works very well and even though it has 35 deg total, its stepped and is not all in until 4500. Do not try to reinvent the wheel here.[/QUOTE
How difficult is it to change to the keyed shafts? Is it basicly a "bolt on" swap or does it involve disassembling the gear cases and rotors? |
[QUOTE=JD33;3609129]
Originally Posted by Old Navy
(Post 3608633)
Convert over to the automotive keyed shaft and your pulley is a phone call to jegs or summit away. My opinion about what timing to run is this...My motor was run with retarded timing like around 30 total, and at about 140 hours (cant remember the exact meter reading) the exhaust valves were leaking badly. Retarded timing elevated the exhaust temps and ruined the valves. The Merc curve works very well and even though it has 35 deg total, its stepped and is not all in until 4500. Do not try to reinvent the wheel here.[/QUOTE
How difficult is it to change to the keyed shafts? Is it basicly a "bolt on" swap or does it involve disassembling the gear cases and rotors? Pretty easy, no need to disassembling the gear casse or rotor, just disassemble the snout and swap the shaft to the keyed shaft. In case if you need to change the shaft coupler on the gear just disassemble the front cover. |
Thats what it looked like from the pics I've found on the net, but sometimes looks can be deceiving. LOL
This may be the route I have to go, so far no stock dia. pulley with the correct offset located to fit my splined shafts. |
[QUOTE=supermx96;3609138]
Originally Posted by JD33
(Post 3609129)
Pretty easy, no need to disassembling the gear casse or rotor, just disassemble the snout and swap the shaft to the keyed shaft. In case if you need to change the shaft coupler on the gear just disassemble the front cover. I'm curious though if anyone knows what snout lengths merc used on thier 525sc? Its seems my splined blower pulleys are odd and never fit the merc splined shafts people have. |