![]() |
Yeah Gary, the deck is done. We only need to glass the side bunks in the cabin, on either side of the fuel tank, and glass in the rigging tube. and the hull will be complete. Then it's assembly time.
|
Assembly time ! Nice !! John better start with the energy drinks now !! LOL
|
Rick, nice job!
How many gallons does the 3 tanks total up to? |
I think it's something like 225 gallons
|
Thanks Rick.
I need ~400 gallons. 87 + 87 + 225 = 399 We're there!!!! |
1 Attachment(s)
1st Leg: NY to Halifax
|
1 Attachment(s)
2nd Leg: Halifax to St John's
|
The above are just a few ways to get to Europe. You guys can design the rest of the trip itineraries to complete the journey to the Mediterranean Sea :cool-smiley-011:
|
|
As long as you dont wind up as the Deadliest Catch.
|
| All times are GMT -5. The time now is 04:28 AM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.