Queenie 04-13-2005 07:37 AM

Re: Winter Project Progress
 
WOO HOO!!!!!!! Finally put some color on the boat last night. Will post pics sometime this weekend of the progress. By then there will more color on it. Should be clearing by Sun or Mon. Tonght the cockpit and control panels get painted (need to get those back to Lofty) and mask for the next set of colors.

Mange 04-13-2005 10:03 AM

Re: Winter Project Progress
 

Originally Posted by rastinger
WOO HOO!!!!!!! Finally put some color on the boat last night. Will post pics sometime this weekend of the progress. By then there will more color on it. Should be clearing by Sun or Mon. Tonght the cockpit and control panels get painted (need to get those back to Lofty) and mask for the next set of colors.


wana see wana see wana see!!!! Have to wait to weekend...

Queenie 04-13-2005 03:53 PM

Re: Winter Project Progress
 
Mange, we both leave the house by 7:20AM, get home at 5:30PM from work (that's if we don't drive straight to the place where our boat is), change clothes, maybe eat, at the boat by 6:10 or so and get home between 9:30 and 10PM if we're lucky.

I'm lucky we get our teeth brushed everyday!

inbetween 04-13-2005 09:31 PM

Re: Winter Project Progress
 
Rob -
You had mentioned that you have some extra gauges. I am interested in them if they're still available. Let me know.
Thanks,
Adam
[email protected]

Queenie 04-14-2005 07:06 AM

Re: Winter Project Progress
 

Originally Posted by inbetween
Rob -
You had mentioned that you have some extra gauges. I am interested in them if they're still available. Let me know.
Thanks,
Adam
[email protected]

Adam-

We're painting our control panels now and then have to return them to CA for some final touches. Once we get them back we'll be installing our new gauges so we'll have several gauges available and you're welcome to take a look at which ones you may be able to use. Should be about 3 weeks by the time we are ready to install new gauges. If we forget please call or PM us around that time and we'll drop them off so you can take a look at them.

Barb

Queenie 04-14-2005 07:07 AM

Re: Winter Project Progress
 
By the way Adam, how's the boat coming along?

inbetween 04-14-2005 04:28 PM

Re: Winter Project Progress
 
Had a minor base coat color setback, but that's been fixed now. Finally picked up all the graphic colors today. Should start graphics by the weekend.

Mange 04-15-2005 04:13 PM

1 Attachment(s)
I had my plate today, fits perfect. I use stock bat-boxes and I'll paint the plate and boxes black. I know everybody tell me it has to be polished. But NO! Black is my choice! Im a little bit concervative..HAHAHAHAHA
So, what do you think?

Queenie 04-17-2005 08:40 AM

Re: Winter Project Progress
 
3 Attachment(s)
OK, we promised some color this weekend so here are a few. Will post a few with the base based with lines and then color. Very happy how it's coming out. Will paint the back sides and transom today and bow will be tomorrow.

Queenie 04-17-2005 08:41 AM

Re: Winter Project Progress
 
3 Attachment(s)
more lines........