Winter project - Motors/Bilge
#84
Thread Starter
Registered
Joined: Jun 2010
Posts: 1,080
Likes: 0
From: Ft. Lauderdale, FL
carter I did one coat of primer which was a quart and then two coats of topcoat which took 1 1/2 quarts. And that was everything, all the way up under the gunnels too...so buy two quarts and you will be fine.
#86
Thread Starter
Registered
Joined: Jun 2010
Posts: 1,080
Likes: 0
From: Ft. Lauderdale, FL
Thanks Artie...and I was just about to post some more pictures 
I figure this will be a good history of the boat when I can't afford to just dump money into the water anymore and have to sell it
Here's some pix of the new full flow stainless raw water intake valves, new water hoses, bilge pumps, float switches, scupper pump, terminal block and candy purple powder coated hatch lift arm

I figure this will be a good history of the boat when I can't afford to just dump money into the water anymore and have to sell it

Here's some pix of the new full flow stainless raw water intake valves, new water hoses, bilge pumps, float switches, scupper pump, terminal block and candy purple powder coated hatch lift arm





