![]() |
Can't wait to see all the upgrades in key west this year. Looking really good guys.
|
2 Attachment(s)
Keeping everything lined up while welding is crucial to getting the desired result of a properly functioning gate. Lots of braces and clamps helped keep it all straight. Cig the Supervisor dog kept us on track with frequent inspections.
|
2 Attachment(s)
With one side complete, we moved to the critical side that held the gate. Our care in measuring and aligning paid off and it went together with a minimum amount of " fussin' and "cussin'".
|
out of curiosity why did you add the boxes?
|
2 Attachment(s)
Internal gusset braces were added to give it the required STURDY. Satisfied with our work, Cig had me sit on the extension to show its strength. Then he made me clean up "and put away all the tools b|#<h" !!
|
out of curiosity why did you add the boxes?
See post # 8. |
[QUOTE=mrpickett357;4279093]out of curiosity why did you add the boxes?
Room, no room for plug in setup. Would have to get new tailpipes again. No room to move engine forward, the boxes allow room for the short driveshaft to connect to the 6 transom assembly, and keep engines in same location. Moving engines would require hatch work, tailpipes, move bulkhead forward into cockpit, then upholstery modifications. Moving trim tab pumps, fuel lines, intercooler lines etc. We can also run a higher drive height. |
Great work guys as usual! Will try to hook up with you guys when you come down. I need to get my a$$ in gear and get a few things done to mine. Fun Run will be here before you know it!
|
Cool project, thanks for sharing!
|
Awesome thread. You guys should have KTRON make you some custom shaft covers for those sixes! Nice work.
|
| All times are GMT -5. The time now is 01:34 AM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.