next, 12 guys, i thought i read yours was 60x 60? did they have to wheel barrel from the street or something? they have things called power trowels, i'm sure they used these. looks like 2 big fans that smooth out the concrete?
it cost me $300,the bucket chicken and a case of beer for 3 mexicans for a 40x60 and they were done by lunch. plus it helps when you buddy owns a 80 meter boom pump truck
for you furture shop builders, try to find guys are experieced in production "new work" concrete and specailize in large flat concrete pours.
i might disagree with your above statement ? it seems some in power here are beyond reproach
#32
SORE MEMBER
Platinum Member
Join Date: Apr 2004
Location: 29°50'49.74"N 95° 5'17.55"W.......TEXAS
Posts: 6,989
Likes: 0
Received 1 Like
on
1 Post
okay wobble, apperaently your not to keen on concrete work. no offense, not everyone has had the pleasure of wheel-barreling concrete. its called a steel trowel finish. anything indoors should have that type of finish. i will agree with the recess for the door, but then you gotta make sure the slab is slopped proper or else rain will puddle in.
next, 12 guys, i thought i read yours was 60x 60? did they have to wheel barrel from the street or something? they have things called power trowels, i'm sure they used these. looks like 2 big fans that smooth out the concrete?
it cost me $300,the bucket chicken and a case of beer for 3 mexicans for a 40x60 and they were done by lunch. plus it helps when you buddy owns a 80 meter boom pump truck
for you furture shop builders, try to find guys are experieced in production "new work" concrete and specailize in large flat concrete pours.
i might disagree with your above statement ? it seems some in power here are beyond reproach
next, 12 guys, i thought i read yours was 60x 60? did they have to wheel barrel from the street or something? they have things called power trowels, i'm sure they used these. looks like 2 big fans that smooth out the concrete?
it cost me $300,the bucket chicken and a case of beer for 3 mexicans for a 40x60 and they were done by lunch. plus it helps when you buddy owns a 80 meter boom pump truck
for you furture shop builders, try to find guys are experieced in production "new work" concrete and specailize in large flat concrete pours.
i might disagree with your above statement ? it seems some in power here are beyond reproach
When I say planning is everything, I am referring to utilities, drainage etc.
You are apparently in the concrete business so there is nothing I can tell you. However there is plenty a potential shop builder can learn from these threads.
#33
Charter Member #232
Charter Member
While spray foam is amazing stuff, I would not use it unless you plan to put sheet rock up over it. That stuff catches fire easy and when it burns it is toxic nasty stuff and it goes up FAST! We test burned some of the leftovers we had at my place. All I could think was man I hope my house never catches on fire!
__________________
Put your best foot forward!
Put your best foot forward!
#34
Registered
9000 sq feet of concrete including the shop, the concrete was poured by 7.30 pm finishing crew left at 4am. They used 3 motorized finishing machines + all the trowel work around the bolts doors etc.
When I say planning is everything, I am referring to utilities, drainage etc.
You are apparently in the concrete business so there is nothing I can tell you. However there is plenty a potential shop builder can learn from these threads.
When I say planning is everything, I am referring to utilities, drainage etc.
You are apparently in the concrete business so there is nothing I can tell you. However there is plenty a potential shop builder can learn from these threads.
#35
Registered
By the way, whats an average price per sq ft for six in thick finished concrete. I'm sure it varies state to state, but I need an idea.............................Rjr.............. ................
#36
Gold Member
Gold Member
While spray foam is amazing stuff, I would not use it unless you plan to put sheet rock up over it. That stuff catches fire easy and when it burns it is toxic nasty stuff and it goes up FAST! We test burned some of the leftovers we had at my place. All I could think was man I hope my house never catches on fire!
Last edited by northernoffshore; 07-02-2010 at 09:16 AM.
#37
Registered
Join Date: Nov 2003
Posts: 701
Likes: 0
Received 0 Likes
on
0 Posts
9000 sq feet of concrete including the shop, the concrete was poured by 7.30 pm finishing crew left at 4am. They used 3 motorized finishing machines + all the trowel work around the bolts doors etc.
When I say planning is everything, I am referring to utilities, drainage etc.
You are apparently in the concrete business so there is nothing I can tell you. However there is plenty a potential shop builder can learn from these threads.
When I say planning is everything, I am referring to utilities, drainage etc.
You are apparently in the concrete business so there is nothing I can tell you. However there is plenty a potential shop builder can learn from these threads.
9000 is a big difference. more than 3 x everything. actually i was in the framing/construction which i delt with alot of concrete guys. i can always learn more, just trying to keep thing simple and understandable so other can also learn.
#38
Registered
Join Date: Nov 2003
Posts: 701
Likes: 0
Received 0 Likes
on
0 Posts
1 yard will cover 54 sq ft at 6" deep, 1 yard is 27 cubic ft so you can do the math from there.
in wobble's case 9000 sq ft at 6" = 167 yrds x $120 = $20000
you can see how things add up quickly.
#39
Gold Member
Gold Member
Join Date: May 2002
Location: DFW
Posts: 1,127
Likes: 0
Received 0 Likes
on
0 Posts
A couple thoughts....A steel building is less flammable than wood.....Bat roll insulation is available ranging from fragile to most durable (lining for the basket ball court insulation may be over engineered but will with stand impact from basket balls) One product to consider may be "wmp 50" which has micro perforations, tough and affordable....Columns can be on center 20' + centers, allowing for one continuous bi-fold wall with wheels that roll up the columns. Further, the wall in up position serves as an awning, eliminates all or some roll up panel doors costing 12 to $1,600 each plus openers and maintainance....Be it a steel building... "Expandable" end walls are worth considering....A trolley beam capable of 5,000# will cost approx. $4,500....18 or 20' eves provide 2nd floor head room for stuff....110 mph wind load, live load and snow load are important....mesh concrete is strong...harder to finish....5 sack cement with complimenting quality sand, aggregate and add mix in a 6" floor poured over good compaction and cushion sand should work....Of course, plenty of rebar, beams and piers.....Or perhaps, an engineer may recommend post tension ( cable tension slab) Concrete should be around $70 a yard as described, plus rebar....finisher, around $1.35/Sq. Ft....pad and cushion sand extra.
Now is a good time to be shopping...Metal building/steel companies are swapping dollars to keep their doors open.
Now is a good time to be shopping...Metal building/steel companies are swapping dollars to keep their doors open.
#40
Registered
Join Date: Jun 2010
Posts: 11
Likes: 0
Received 0 Likes
on
0 Posts
Concrete prices
Are the concrete prices you guys are giving just for the aggregate? I am currently working with Morton Buildings on a project and they are telling me $4.50 a sq. ft. for concrete work start to finish.
Thanks.
Thanks.