Go Back  Offshoreonly.com > General Discussion > General Boating Discussion
Any one in dock building business? Or even just familiar with them......? >

Any one in dock building business? Or even just familiar with them......?

Notices

Any one in dock building business? Or even just familiar with them......?

Thread Tools
 
Old 06-08-2016, 12:55 PM
  #11  
VIP Member
VIP Member
 
BONDO10's Avatar
 
Join Date: Jun 2009
Location: Onset,MA
Posts: 909
Received 74 Likes on 24 Posts
Default

Originally Posted by Taboma
Trump???
??
BONDO10 is offline  
Old 06-08-2016, 02:38 PM
  #12  
Registered
Thread Starter
 
Join Date: Sep 2002
Location: Manhasset, NY
Posts: 1,943
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by Unlimited jd
4' wide is plenty stable if you have a single pile at the end. My whole marina is 32'x4' fingers
That's what I was thinking. I'll try to get that approved. Thanks for the info......
Here's Johnny is offline  
Old 06-09-2016, 01:54 PM
  #13  
Registered
 
Join Date: Jun 2004
Location: Somewhere in Ohio
Posts: 3,397
Received 21 Likes on 10 Posts
Default

As for dock length, if you don't have to worry about wave action or boat wakes, I routinely stern my 382 into a dock that's only 18' long. Cross tie the stern, and it's no problem. I assume it's out of the question, but can you drive a pile in further off the end of the dock to tie the boat too?
RT930turbo is offline  
Old 06-09-2016, 03:52 PM
  #14  
Registered
 
damdonzi's Avatar
 
Join Date: Jul 2003
Location: ME and NH
Posts: 1,933
Received 12 Likes on 10 Posts
Default

Is this a permanent dock or seasonal that needs to be removed annually?
4x30 can be stable but there are variables you need to consider which revolve around bracing for stability.
If it is totally floating, then you are only as strong as your anchoring system. Traditional blocks or helical screws.
If it is a pipe dock, the typical dock has the water getting deeper the further away from shore. The longer pipes on the end will make the dock want to sway back and forth based on wave action. Again, anchoring systems to fasten this can help. If you have the ability to throw a piling into the mix, that changes everything in your favor to provide a more stable dock. The piling in that case is your anchoring system. Water depths play a significant factor in all this.
damdonzi is offline  
Old 06-09-2016, 03:59 PM
  #15  
Registered
 
Join Date: Jun 2005
Posts: 11,655
Received 887 Likes on 481 Posts
Default

Originally Posted by Dean Ferry
Be careful if you have to deal the Army corp of Engineers, permit sign-off wise
I know a guy going through he11 with the ACoE right now. Bought a house for 2.5 million, wood truss seawall needs to be replaced and he put in for an ACoE permit. They reviewed and said they will issue the permit as soon as he tears down everything behind the front door to the seawall (basically teardown the 15 yr old house). House was built too close to the water, city passed it but they don't agree and 15 years after it was built they now realize it doesn't meet their standards. He even got a a demolition order from them (red sticker on the front door). Needless to say 5 years later he is still fighting with them and living in the house (for now).
Jupiter Sunsation is offline  
Old 06-09-2016, 05:17 PM
  #16  
Charter Member
Charter Member
 
Dean Ferry's Avatar
 
Join Date: Nov 2000
Location: Merritt Is. Fl. USA
Posts: 7,212
Received 393 Likes on 141 Posts
Default

Originally Posted by Jupiter Sunsation
I know a guy going through he11 with the ACoE right now. Bought a house for 2.5 million, wood truss seawall needs to be replaced and he put in for an ACoE permit. They reviewed and said they will issue the permit as soon as he tears down everything behind the front door to the seawall (basically teardown the 15 yr old house). House was built too close to the water, city passed it but they don't agree and 15 years after it was built they now realize it doesn't meet their standards. He even got a a demolition order from them (red sticker on the front door). Needless to say 5 years later he is still fighting with them and living in the house (for now).
It's just crazy isn't it! We're getting ready to replace both our seawalls/docks, and I'm NOT EXPANDING ANYTHING, just to make sure I can get my permits. But then again, both of our lifts are already 10,000 lbs lifts. I'm going to put the 25 Talon on one at my mother-in-laws place, and the 388 on ours. I'm going to ask the dock contractors about adding a single pylon jet-ski lift for a little jet boat for my girls, we'll see what they saw about the possible permit issues with that....
__________________
Everything is for sale @ a certain $$
Dean Ferry is offline  
Old 06-10-2016, 04:56 AM
  #17  
Registered
Thread Starter
 
Join Date: Sep 2002
Location: Manhasset, NY
Posts: 1,943
Likes: 0
Received 0 Likes on 0 Posts
Default

WOW.....they sure make it fun....... thanks for the tips guys. I'll be going over details with my consultant soon. Hopefully I'll be allowed a pile or two, then that would make a 4'x30' work well. It's a canal with no wave action....... I'll keep you guys posted, thanks again......
Here's Johnny is offline  
Old 06-10-2016, 05:51 AM
  #18  
VIP Member
VIP Member
 
BONDO10's Avatar
 
Join Date: Jun 2009
Location: Onset,MA
Posts: 909
Received 74 Likes on 24 Posts
Default

Contract a reputable Engineer/Engineering Firm who are local to where your project is. Not sure the process in N.Y. but here in Mass the dock has to be approved locally by the town before any of the Fed and State agencies will even look at it. Having a local Engineer that the various boards are familiar with always helps.
As far as 4' width, that is what my current floating dock is and it's very stable. I have the black plastic tubs for flotation under 8' sections. The key to stability is to join the sections so there is no play between the two. I have two eyebolts at the ends of each section, the previous owner had shackles joining the two, I replaced them with 4' sections of pipe thru all four eyebolts and end caps so they can't walk out. The side to side stability is night and day.
BONDO10 is offline  
Old 06-10-2016, 05:58 AM
  #19  
Registered
 
Join Date: Jun 2007
Location: Merritt Island, FL
Posts: 6,651
Received 1,329 Likes on 742 Posts
Default

Originally Posted by Dean Ferry
It's just crazy isn't it! We're getting ready to replace both our seawalls/docks, and I'm NOT EXPANDING ANYTHING, just to make sure I can get my permits. But then again, both of our lifts are already 10,000 lbs lifts. I'm going to put the 25 Talon on one at my mother-in-laws place, and the 388 on ours. I'm going to ask the dock contractors about adding a single pylon jet-ski lift for a little jet boat for my girls, we'll see what they saw about the possible permit issues with that....
Dean can you use one of the swing away lifts? Those don't count in your over water coverage limits because you can swing it back over your dock.

That's the theory anyway. We had to shorten my dock and make the outer walkway narrow to pass.
Wildman_grafix is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.