Powerquest Factory
#713
It's been a while. I wonder if they will actually "MAKE IT"???
Hope so. They make (made) a nice product.
Hope so. They make (made) a nice product.
__________________
BillR
'00 Scarab Sport 302 CC
'02 Cigarette Top Gun TS
'02 PQ 340
'00 PQ 280
'98 Scarab 22
'97 Baja Outlaw 20
'72 Checkmate
'65 Glastron
BillR
'00 Scarab Sport 302 CC
'02 Cigarette Top Gun TS
'02 PQ 340
'00 PQ 280
'98 Scarab 22
'97 Baja Outlaw 20
'72 Checkmate
'65 Glastron
#714
Well I talked with Bob about a week ago regarding them doing some upholstery work for me. He sent me some samples to match colors so as soon as I can get to the boat , I'll be pulling the back seat and sun pad off to take up to the factory. Than I'll have some news to report.
By the the way if I'm not mistaken the sun pad is screwed from the back side of the fiberglass hatch? Which if I'm right means I don't have to remove the entire deck lid??? Can anyone confirm that?? I'm trying to figure out how much time its going to take to remove these items. If I have to take the entire lid off I'll need to have some help.
By the the way if I'm not mistaken the sun pad is screwed from the back side of the fiberglass hatch? Which if I'm right means I don't have to remove the entire deck lid??? Can anyone confirm that?? I'm trying to figure out how much time its going to take to remove these items. If I have to take the entire lid off I'll need to have some help.
#715
Registered
Joined: Jun 2004
Posts: 269
Likes: 0
From: Wichita, KS
On my 290 it was screwed from the bottom with 16 or 20 screws and finish washers, and came off in one piece, and left the raw galss / wood base still hinged to the boat. The deck will need ot be about 100 degrees up so you can get in witha screwdriver for the back screws, so have a friend or rig a support for the deck while it is vertical





Get back with y'all later tonight.