![]() |
1 Attachment(s)
Before the day was over I was able to get a couple of engines hung
|
2 Attachment(s)
Check the clearance between the cowlings
|
David it looks amazing. Great work and love your boat!
|
Originally Posted by da*****rcury
(Post 4339530)
Before the day was over I was able to get a couple of engines hung
|
We wont be there this year Sam, are you going to run in the shootout?
|
Originally Posted by da*****rcury
(Post 4339517)
With enough boat life 2 part loaded and ready in the caulk guns I proceeded to apply liberal amounts of caulking to the mating areas of the transom, aluminum plate and jackplate mating surfaces
I was working by myself and had to work with a sense of urgency due to the cure times of the 2 part sealant. Eventually I got it done |
Originally Posted by da*****rcury
(Post 4339547)
Check the clearance between the cowlings
|
Originally Posted by da*****rcury
(Post 4339577)
We wont be there this year Sam, are you going to run in the shootout?
|
Originally Posted by skate
(Post 4340026)
Not this year. I have not had time this summer to dial it in. Too many commitments. I did see 97.5 with my bravo props with 4 on board and 3/8+ tanks. It's at Boat Customs for bottom blue printing final clearcoat and some additional hardware. I'll be at Camden with my wife this year I was hopeful the wives could meet.
Are you going boatless this year or will your skater get finished in time to have it there to.just have fun driving around? |
Originally Posted by Nice Pair
(Post 4339988)
As usual ........... "Awesome" work
|
| All times are GMT -5. The time now is 03:26 AM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.