![]() |
4 Attachment(s)
more
|
4 Attachment(s)
more 2
|
4 Attachment(s)
more 3
|
2 Attachment(s)
more 4
|
The latest on the 34.
Steve has done the following on the 34:
It looks like the eninges will be fired up in leass than 2 weeks. I will have pics for you this week of the above installations :) |
noli, you must be getting all AMPED UP !!!!! Boating in two weeks !!!!!
|
Gary, it is soo exciting to see the 34 come together.
I think next week Steve will start water testing. Sean, get those nails of yours sharpened :) |
4 Attachment(s)
Some pics from last Saturday. Steve has pretty much all of the riggin completed.
He is waiting on me to bring the steering wheel. The one on the boat is only temporary. I'm looking for a good aluminum fish style steering wheel. The fuel labels are aluminum and screwed down, not just glued down. Batteries are in. |
4 Attachment(s)
The marine switches are water proof and the white back plate is made from carbon fiber. Steve is very meticulous about the rigging. Some shots of the Vessel View. Nice color screen. Very bright under sun light.
|
4 Attachment(s)
...more shots fo the vessel view.
The Can Pad is installed. This will allow for single lever maneuverability on the twin engines. There are two locations for the trim switches. On the dash and the other on the Zero Effort controls. |
| All times are GMT -5. The time now is 07:32 AM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.