![]() |
2 Attachment(s)
ignition keys and kill lanyard and port battery switch
|
4 Attachment(s)
Zero Effort DTS controls location and instrument panel layout.
|
4 Attachment(s)
3, possibly 4 fuel gauges location. And stern hydraulic steering hoses location.
|
5 Attachment(s)
The 34 is warm and dry for the winter months inside Steve's workshop at Ocean Outboard.
|
1 Attachment(s)
Accompanying the 34 is an STV all wrapped up and winterized. It has a bad azzz outboard. :)
|
Noli- great pics, best of luck!
|
noli, glad to see progress on your beautiful 34' Superboat !!!!
|
Noli ! Looks like you'll be seeing a Christmas run. Looking good.
|
Thanks Rick.
I'm guessing around the middle of January is the first splash with Steve doing the initial dial-in. I won't be there I think. We're taking time on this as this is a winter project. The engines are not in yet because they were ordered last week. And silly me, we're still relocating the instruments on the dash :eek: Christmas is only 7 weeks away....yikes! noli |
Christmas is only 2 weeks away!
Wouldn't it be a nice Christmas gift to my family if I were to order a new 32 Supercat from JC? First things first...anyone interested in purchasing my 34 with twin 300HP Verados? The engines haven't come in yet :) This is good for a possible engine swap if you so care to do :) The 34 is over at Ocean Outboard in Freeport :) Those of you wanting to look at the 34 please see Drew at OO. noli |
| All times are GMT -5. The time now is 12:07 PM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.