The new boat....a 30 CC
#343
Thread Starter
Registered
Joined: Sep 2007
Posts: 706
Likes: 0
As far as completion.....hoping mid to end of January!
#344
Probable need around 3 weeks once the hull and deck are pulled. Priority now is getting the new molds (3) done for the motor well, seat base and console base. By the end of next week I should have a part out of both the motor well and seat base molds.
#345
I think a couple of these on the back would wake this ride up alittle too.

heres the link.
http://www.detwilerjackplates.com/all_in_hydraulic.htm

heres the link.
http://www.detwilerjackplates.com/all_in_hydraulic.htm
#346
Thread Starter
Registered
Joined: Sep 2007
Posts: 706
Likes: 0
Well looks great Rick, I never knew all the work that went into making even the smaller molds



