![]() |
18,000! thats my guess!
|
10k
|
$15,200.00
|
$16,000. I figure two weeks installation, plus $3-6K to go through the engines.
|
B Break
O Out A Another T Thousand Do it yourself it is cheaper,but at this point what the hell does that matter.My guess is 10,000.00 or less Leon is a straight up guy who plays no games. |
Originally Posted by 1HYPER1
(Post 2656808)
B Break
O Out A Another T Thousand Do it yourself it is cheaper,but at this point what the hell does that matter.My guess is 10,000.00 or less Leon is a straight up guy who plays no games. You said or less so I put you in at 9.5 |
Educated guess says 11 grand at 95.00 per hour labor rate.
|
LOL, I had just my wiring requoted from the dash back for a grand total of $15,000.
Guess thats why I love working on it myself and taking my time. Jon |
No more than 115 hrs, I chose 113hrsX$95=10,735+tax Engines redone, new drives,rigging and electrical. I'm at 40 engines, 20 floor and stringers, 8 drives, 55 paint and trim, 8 rigging, and another 30 for assembly. Total=161hrs
|
Thanks guy's
|
| All times are GMT -5. The time now is 12:24 AM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.