![]() |
Originally Posted by flenner
(Post 3035517)
Bilge looks great. I've been waiting two months for my new intakes to come in so I could finish my engine build. We finally got them Friday and yesterday got the first engine on the dyno. Took some time chasing and electrical gremlin. Ended up being my distributors. Final pull........637HP at 5600 rpm and peak torque was 686 at 4100 rpm. I can't say enough about my buddy Eric (owner of EB Marine) and Troy. I am very pleased with the results and they have been great threw out the whole thing.
|
1 Attachment(s)
2 Melling HV77's with pickups freshly welded.
|
Originally Posted by flenner
(Post 3035517)
Bilge looks great. I've been waiting two months for my new intakes to come in so I could finish my engine build. We finally got them Friday and yesterday got the first engine on the dyno. Took some time chasing and electrical gremlin. Ended up being my distributors. Final pull........637HP at 5600 rpm and peak torque was 686 at 4100 rpm. I can't say enough about my buddy Eric (owner of EB Marine) and Troy. I am very pleased with the results and they have been great threw out the whole thing.
|
1 Attachment(s)
Finished the bilge tonight. Start putting the bilge back together tomorrow, waiting on some motor parts. Rod Bearings, balancers, timing gear bolts and oil pump intermediate shafts.
Powdercoating finished will pick up in the am. |
Somebody stop mmmeee!
|
Originally Posted by Thunderstruck
(Post 3037435)
Finished the bilge tonight. Start putting the bilge back together tomorrow, waiting on some motor parts. Rod Bearings, balancers, timing gear bolts and oil pump intermediate shafts.
Powdercoating finished will pick up in the am. |
Originally Posted by laszlo01
(Post 3037438)
Very nice job, looking good.
|
Oops, also waiting on springs, retainers, locks and lifters from our bestest valve train guru, RMBuilder.
|
Originally Posted by Thunderstruck
(Post 3037446)
Well, how's the motors coming along Las??
|
Originally Posted by Thunderstruck
(Post 3037435)
Finished the bilge tonight. Start putting the bilge back together tomorrow, waiting on some motor parts. Rod Bearings, balancers, timing gear bolts and oil pump intermediate shafts.
Powdercoating finished will pick up in the am. |
| All times are GMT -5. The time now is 09:08 PM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.