36 37 Stepped Warrior
#154
Drilled the new door for the handle and stop. Dropping off for powder coat tomorrow and grab handles. Drive gaurd on trailer at pivot was froze solid so I split it cleaned stud and pivot hold. Stitch welded the slots back up and the cracked welds are all repairs. Also where the pin went I the end of the trailer was tweaked in. Nothing a ratchet strap and a 2" think beam can't fix. Capacitor is all in and wired. Floor stripped ready to be pulled and used as template. Had 60 gal. Of bad fuel pumped it out and fresh 93 in. I know where empty is on my gauge now. Still have odds and ends but dwindling down.
#155
Tore up the floor going to clean it up and prep for the new lonseal and foot rests. Going to box the subs for better sound and hopefully cut the reverberation that seems to happen. Should be 99% there by saterday. Still waiting in scoops from unlimited product air scoops, pro stock are the one I ordered. Not to happy with them said 2 1/2 weeks turn around been about 4 1/2 weeks as of today.
I'll keep this updated.
I'll keep this updated.
#157
Thanks J doing the best I can and moving as quickly as parts and time allows while trying to do it correct. It's my father and I and he can only do as much as his body will allow of course so I do the rest. Hopefully more parts show up today.
#160
Floor is all prepped and ready for adhesive and flooring. I'll will template the new floor on Sunday morning and clean the boat floor 1 more time before laying it down. Interior came back today. So that's should be going in ASAP after the floor is down. Just ordered some much room cleats and lines as there seems to be no where to put the fenders on the boat. We shall rectify that issue ASAP. Door and handles go to powder coat she least come in so all are the same color. Splash is very soon...




