![]() |
What does the paper work say ??
|
post #6 on 10-9-15 you acknowledge 750 out and 750 in per motor ..I think that is high but you were aware of it as of 10-9-15
|
If you have the mechanical ability disconnect everything yourself then just have someone with a forklift pull them out. $50 per hr with the operator when I did mine. Took about 1 hr for 2 engines after I disconnected everything
|
Originally Posted by motor
(Post 4401936)
post #6 on 10-9-15 you acknowledge 750 out and 750 in per motor ..I think that is high but you were aware of it as of 10-9-15
|
Do you plan on doing any of the mechanical work?
|
maybe he thinks you have to much money and are clueless as to cost...1500 r&r (750 each) is a lot closer to the real world.....imo
Originally Posted by SunsationLarry
(Post 4402134)
That was my understanding but after starting thread I asked again and he said I misunderstood and was 1500 for both in and out...
|
| All times are GMT -5. The time now is 10:25 PM. |
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.