Jaws SS
#12
All the layers are labeled, that is 1.5 oz csm (chop strand mat) between the wood
__________________
Throttles- Cleveland Construction 377 Talon
08 OPA Class 1 National Champion
08 Class 1 Geico Triple Crown Champion
08 OPA High Points Champion
10 OPA Class 1 National Champion ( happy now Ed! )
Throttles- Cleveland Construction 377 Talon
08 OPA Class 1 National Champion
08 Class 1 Geico Triple Crown Champion
08 OPA High Points Champion
10 OPA Class 1 National Champion ( happy now Ed! )
#13
Registered
The black biotch!
#14
Registered
try again
#16
Thanks for all help Dave. Really appreciate it. I think I might go with the 3 layers of half inch vs. the 2 layers of 3/4. I dont think the cost would be that much more compared to more strength.
#18
Registered
Join Date: Jul 2012
Posts: 130
Likes: 0
Received 0 Likes
on
0 Posts
I just finished the glass work in my Seebold. I did transom, engine stringers, engine bulkhead, cabin stringers and the floor. I used 50 yards of 12 inch 1708 tabbing cloth, 20 yards of chop strand, 18 yards of 1708 50" wide, 5 gallons of cabosil (resin thickener) 4 pounds of 1/4" chop strand fibers, and 20 gallons of Poly resin. I got all my stuff from www.uscomposites.com. That seemed to be the cheapest place for all the materials. Shipping is rrreally expensive on this stuff though.