Flying solo today. Got the rt main stringer tabbed in as well as the rt #3 bulkhead. Interesting that the deck hoist notch in the rt bulkhead is about 1/2” off of where the left one was. I don’t know if this was by design or because it was built on a Friday and it was beer thirty in Sarasota. I put the notch where they had it...
Attachment 572758 Attachment 572759 Attachment 572760 the hull hasn’t moved. My laser is still shooting thru the holes. And as Forrest Gump would say “that’s one less thing to worry about!”... Attachment 572761 I’d like to have this baby ready to roll late spring. I happened on a guy on the powerboat swap shop on Facebook who had offshore mounts, transom raw water pickups and bellhousings. Spoke to Rik at arneson, I’m gonna send him the drives and he’s gonna refurb them and also send me some boxes. Also checking on some large rectangular port aluminum heads with larger combustion chambers so we can use smaller blower pulleys to get the power up. Anyways that’s it for now... |
3 Attachment(s)
Me and Brian got some more done tonight. We went ahead and tabbed in the the left inner main stringer. We still have to section in the rear part of the outer main stringers. You can see in this photo where the rot ends...
Attachment 572913 main stringers... Attachment 572914 Attachment 572915 Once we get the outer stringer ends replaced, we have to replace the 4 small stringers in the rear of the cabin and that’ll be all the rot replacement forward of the cockpit (excluding the center stringer framework under the floor) I hope to have all this done this week. |
You are moving along at a great pace for a night sideline job!!
keep it up! I enjoy following your build! |
1 Attachment(s)
I’ll be working on it again tomorrow. Meanwhile got the drives crated up and will be sending them to Rik at arneson to be rehabbed...
Attachment 572997 |
Curious to read what an arneson rehab might cost around! Wish i can find used arneson for my project too!
|
3 Attachment(s)
As normal my goal of having everything forward of the cockpit by the week and didn’t happen. Had a thanksgiving today. Then had to watch alabama get beat. Came up here and got some stringers ready to tab in. May get it done tomorrow afternoon. Takes a little while to prep the stringers as I am getting all wood out and then roughing up the fiberglass down in the channel as well as roughing up the glass where the mat will lay. As I’m doing all this nasty work I’m thinking of how worthwhile it is. When we took the 30 footer to bimini a few months ago, it was so rough the pickups in the fuel tank broke off and all kinds of screws in the cabin bulkheads were backing out, hurt my back on a few of them. but the stringers still looked fine on later inspection.
Attachment 573006 Attachment 573007 Attachment 573008 |
Originally Posted by jeff32
(Post 4595787)
Curious to read what an arneson rehab might cost around! Wish i can find used arneson for my project too!
|
Looks great. I enjoy re rigging boats. No way i will touch fiberglass. Lol enjoying your tread keep us updated.
|
2 Attachment(s)
Thanks 90viper.
Got more done. I have more resin coming, hopefully by the end of the week. Gonna try to get the floor and everything forward of the cockpit done by this weekend. Attachment 573079 Attachment 573080 |
4 Attachment(s)
Got some cardio in tonight. Tore the center bracing out and got the two small pieces fit to go in the outer rear main cabin stringers. I also have to cut out the left rear cabin stringer and replace it. We noticed the rot extends under the v berth. We’ll be cutting into that later. My goal of being done forward of the cockpit by this weekend ain’t gonna happen...
Attachment 573142 Attachment 573143 |