Offshoreonly.com

Offshoreonly.com (https://www.offshoreonly.com/forums/)
-   Scarab (https://www.offshoreonly.com/forums/scarab-41/)
-   -   Back from the Dead; '81 Scarab 38 Resto (https://www.offshoreonly.com/forums/scarab/336665-back-dead%3B-81-scarab-38-resto.html)

hblair 02-17-2019 03:36 PM

That’s an interesting idea Todd, thanks for the input. But I don’t think I’ll be adding one. I’m just trying to get some steady progress here. Keep us posted on your nova.

endeavour32 02-19-2019 06:39 AM

Boat is looking great Heath! I haven't been keeping track of the progress enough, but I was happy this morning to see the deck was back on!

1design 02-20-2019 10:22 PM

That hull and cap has such beautiful lines.

outonsafari 02-23-2019 04:36 PM

Looks awesome heath. Hows the tabbing going ? Are you following glassdaves overlapping technique ?
That pic where your grinding around the outside (rubrail area) is that a flappy or one of those tangled up chewy paint eaters.
Need something like that or a drum i can put on the 4 or 7 inch electric angle grinder.

hblair 02-26-2019 10:57 PM

Thanks I haven’t had time to work on it in several days. That’s a 3M 7476 I believe. We use them a lot on cars. I hope to get back on the boat here in a week or so.

Stclair26 03-01-2019 02:11 PM

You have done some great work! I've enjoyed the read and watching the progress, can't wait to see it done!

hblair 03-02-2019 11:54 AM

Thank you stclair. I finally was able to get some more done today. I’m flying solo right now so it’s slow go. I was able to do some tabbing. I got the v berth area port and starbd done. I figured out it was much easier to cut the pieces in about 18” lengths and overlap them to get them to stay in place. Also a rock grinder with a cutting wheel is the fastest way to cut the screws back.

https://cimg3.ibsrv.net/gimg/www.off...8d5a416ef.jpeg
https://cimg2.ibsrv.net/gimg/www.off...edb572abc.jpeg
https://cimg4.ibsrv.net/gimg/www.off...778e64c1e.jpeg

hblair 03-03-2019 05:50 PM

Got the port and starbd Setee area prepped and tabbed as well as finished a few places in the floor and started repairing a few places on the bow....

https://cimg6.ibsrv.net/gimg/www.off...042053c68.jpeg
https://cimg7.ibsrv.net/gimg/www.off...de6d8df8f.jpeg
https://cimg8.ibsrv.net/gimg/www.off...f667a9859.jpeg

hblair 03-03-2019 05:52 PM


hblair 03-03-2019 05:55 PM



All times are GMT -5. The time now is 10:54 AM.