Back from the Dead; '81 Scarab 38 Resto
#564
Registered

Joined: May 2009
Posts: 1,942
Likes: 527
Looks awesome heath. Hows the tabbing going ? Are you following glassdaves overlapping technique ?
That pic where your grinding around the outside (rubrail area) is that a flappy or one of those tangled up chewy paint eaters.
Need something like that or a drum i can put on the 4 or 7 inch electric angle grinder.
That pic where your grinding around the outside (rubrail area) is that a flappy or one of those tangled up chewy paint eaters.
Need something like that or a drum i can put on the 4 or 7 inch electric angle grinder.
#567
Thank you stclair. I finally was able to get some more done today. I’m flying solo right now so it’s slow go. I was able to do some tabbing. I got the v berth area port and starbd done. I figured out it was much easier to cut the pieces in about 18” lengths and overlap them to get them to stay in place. Also a rock grinder with a cutting wheel is the fastest way to cut the screws back.
















